A huge trench has been dug to the pipe which leads to a stopped-up overflow tank from the CR.* The owner has taken immediate action (digging out sand around the sewage pipe, followed by 2-3 weeks of waiting). Here, at the suitably discreet hour of 3am, the long awaited Champion arrives, dressed in uniform of swim cap and trunks. A big sigh at what lies ahead.
* Comfort room, i.e. toilet.